NOTICE: A Planned Road Closure on Sir Sydney Walling Highway

Black Immigrant Daily News

The content originally appeared on: Antigua News Room

Ongoing works associated with the Government of Antigua and Barbuda Second Road Infrastructure Rehabilitation project will result in: road closures, slow moving traffic as well as single lane traffic on sections of Valley Road North (VRN) and along sections of Sir Sydney Walling Highway (SSWH).

Details of the traffic interventions are as follows. Traffic intervention for week beginning Monday 15th August 2022 include:

A Planned Road Closure on Sir Sydney Walling Hwy

The contractor intends on initiating a road closure on a section of SSWH – east of Pares Village. This planned road closure is earmarked to begin on Monday 22nd August 2022 for about six to eight weeks at minimum.

The works will require that the Highway be Closed to ALL through traffic. There will be local access only to businesses and residents. Eastbound (towards Pares village) and westbound traffic (towards SSWH) will be diverted onto Potworks Dam main road and Collins main road.

Slow moving traffic can be expected on a section of Valley Road North (VRN)

From Monday 15th August, 2022.

There will be:

Single Lane Traffic between the Golden Grove Football Field and Whenner’s Rd.
Single Lane Traffic on VRN between Creekside and Antigua State College for Asphalt Work.
Single Lane Traffic on VRN between Golden Grove School and Antigua State College to repair existing drains in the area.
Single Lane Traffic on VRN in Jennings towards the end of the week to do Full Depth Reconstruction. The traffic will be controlled by Flag Persons in all areas during the day time and signage will also be in place.

CLICK HERE TO JOIN OUR WHATSAPP GROUP

NewsAmericasNow.com

Advertisements
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *